Infrastructure: Launch of the Solar Power Policy 2020
Proposed to setup a 10MW plant in Meghalaya which would see an investment of 150 crores. The location for the plant has been set at Ri-Bhoi and West Garo hills. Solar Energy is one of the sources to help bridge the gap between the production of 185.2MW Energy against the requirement of at least 610MW of power.